Plumbing and sanitary
Ramadan Drain CleaningSanitary fixture installation in Mishref
Sanitary fixture installation in Mishref means we fit a bath, toilet or sink so it connects right to your pipes and drains properly. Mishref is a mixed residential area with villas, flats and apartment blocks, and older houses have their water and waste lines in different spots than newer builds.
Before you buy
When a swap isnot a swap.
Four things decide whether an installation is simple or needs extra work.
01
The waste sits at a different height
Every fixture has its waste outlet at a set height. If the new toilet takes a floor outlet and yours is in the wall, or the other way round, the installation means changing the waste and not just connecting it.
02
The unit hangs on the wall
A wall hung toilet or basin is not held by tiling. Each needs a steel frame fixed into the wall behind the finish to carry the whole load, and that is decided before the tiling, not after it.
03
The new unit is a different size
A new basin may cover the old fixing holes or fall short of them, and a new toilet may be longer and stand away from the wall. Checking the dimensions before buying saves a trip back to the shop.
04
There is no valve for it
A fixture installed with no angle valve of its own means any later repair stops water to the house. A proper installation includes a valve on each supply arriving at it.
This area
What setsthis area apart
Mishref has older flats on high floors where water comes from the roof tank, and waste runs down a long riser stuck to an interior or exterior wall. If you want a new bath fitted, we first check that the supply pipes reach far enough, and that the waste line connects to the nearest outlet with the right slope. Newer villas in the area have better fittings, but the same steps are essential.
Mishref lies in Hawalli governorate, a mixed residential district with older and newer buildings that have different waste arrangements depending on when they were built.
The waste riser in older Mishref flats usually has thick walls and is well-secured, so fitting heavy fixtures on it requires checking its strength first.
In short
The fitting work.
Service
Sanitary fixture installation and connection
The fixtures
Basins, toilets, kitchen sinks, bidet sprays, utility sinks
Included
Fixing, water and waste connection, angle valve, silicone
The old units
Removed and taken out of the way before fitting
Hours
Daily, 6:00 in the morning to 12:00 midnight
How we fit it
From measuringto running it.
The order here saves breaking, which is why we do not rush it.
We measure waste and supply
The height of the waste outlet and the positions of the supply pipes are measured against the new unit's own dimensions, before anything old comes off.
We remove and prepare
The old unit comes off, the old silicone is removed completely and the surface cleaned, because any residue stops new silicone bonding properly.
We fix and level it
The unit is fixed and levelled first, and connected second. Connecting before fixing means any later adjustment pulls on the joints and they start weeping later.
We connect, test and seal
Water and waste are connected, the unit is run, and every joint is checked under pressure. The silicone bead goes on last, once everything is proven dry.
Common questions
Questions about Sanitary fixture installation in Mishref
Yes, as long as the waste pipe below it is strong and sits high enough above the outlet. We inspect the spot first and tell you whether it will work or not.
We fit it near the fixture or on a shelf in the bathroom, and the pipes drop from it by gravity. We use this fix for old flats where water will not reach from the roof tank.
Other services
Other services in Mishref
Other work we do in the same area.