RAMADAN DRAIN CLEANING +965 551 09200

Plumbing and sanitary

Ramadan Drain CleaningSanitary fixture installation in Zour

Sanitary fixture installation at Zour deals with very high water pressure and extreme heat from the power station. Zour has control buildings, laboratories and cafeterias, and fixtures must handle strong pressure and hot water from cooling systems.

A new wall mounted bathroom basin with its plastic waste trap visible underneath

Before you buy

When a swap isnot a swap.

Four things decide whether an installation is simple or needs extra work.

01

The waste sits at a different height

Every fixture has its waste outlet at a set height. If the new toilet takes a floor outlet and yours is in the wall, or the other way round, the installation means changing the waste and not just connecting it.

02

The unit hangs on the wall

A wall hung toilet or basin is not held by tiling. Each needs a steel frame fixed into the wall behind the finish to carry the whole load, and that is decided before the tiling, not after it.

03

The new unit is a different size

A new basin may cover the old fixing holes or fall short of them, and a new toilet may be longer and stand away from the wall. Checking the dimensions before buying saves a trip back to the shop.

04

There is no valve for it

A fixture installed with no angle valve of its own means any later repair stops water to the house. A proper installation includes a valve on each supply arriving at it.

This area

What setsthis area apart

Zour is a sensitive industrial site with high safety standards, strong foundations and deep underground main pipework. Cold and hot water comes from a central cooling system at pressure higher than normal locations, so every fixture must withstand that stress. We test every installation under full pressure before actual use.

Zour sits in Ahmadi governorate, an industrial area with a power generation and cooling plant.

Water pressure at Zour station is higher than residential areas, so fixture installation requires pressure testing before commissioning.

In short

The fitting work.

Service

Sanitary fixture installation and connection

The fixtures

Basins, toilets, kitchen sinks, bidet sprays, utility sinks

Included

Fixing, water and waste connection, angle valve, silicone

The old units

Removed and taken out of the way before fitting

Hours

Daily, 6:00 in the morning to 12:00 midnight

How we fit it

From measuringto running it.

The order here saves breaking, which is why we do not rush it.

01

We measure waste and supply

The height of the waste outlet and the positions of the supply pipes are measured against the new unit's own dimensions, before anything old comes off.

02

We remove and prepare

The old unit comes off, the old silicone is removed completely and the surface cleaned, because any residue stops new silicone bonding properly.

03

We fix and level it

The unit is fixed and levelled first, and connected second. Connecting before fixing means any later adjustment pulls on the joints and they start weeping later.

04

We connect, test and seal

Water and waste are connected, the unit is run, and every joint is checked under pressure. The silicone bead goes on last, once everything is proven dry.

Common questions

Questions about Sanitary fixture installation in Zour

No, the pressure is too high, so we select industrial-grade fixtures rated for high pressure. We test them under actual pressure before commissioning.

It can if pipes are old or not insulated properly. At Zour we use heat-resistant pipes and insulate them well, and regular maintenance is very important.

Nearby areas

More areas for Sanitary fixture installation

Same service, in nearby areas.

Other services

Other services in Zour

Other work we do in the same area.

Back to Sanitary fixture installation

Ramadan Drain Cleaning

Need this inyour area?

Call and describe what is happening, and the right kit is ready before we arrive.

Call now