Plumbing and sanitary
Ramadan Drain CleaningSanitary fixture installation in Khitan
Sanitary fixture installation in Khitan starts with measuring distances and heights because it is an older area with small tightly packed flats. Khitan near the co-op and hospital has mid-range and older apartments with narrow walls and limited spacing between waste outlets.
Before you buy
When a swap isnot a swap.
Four things decide whether an installation is simple or needs extra work.
01
The waste sits at a different height
Every fixture has its waste outlet at a set height. If the new toilet takes a floor outlet and yours is in the wall, or the other way round, the installation means changing the waste and not just connecting it.
02
The unit hangs on the wall
A wall hung toilet or basin is not held by tiling. Each needs a steel frame fixed into the wall behind the finish to carry the whole load, and that is decided before the tiling, not after it.
03
The new unit is a different size
A new basin may cover the old fixing holes or fall short of them, and a new toilet may be longer and stand away from the wall. Checking the dimensions before buying saves a trip back to the shop.
04
There is no valve for it
A fixture installed with no angle valve of its own means any later repair stops water to the house. A proper installation includes a valve on each supply arriving at it.
This area
What setsthis area apart
Khitan has buildings from the 1980s and 1990s with strong concrete foundations, but the old pipes are narrow and sometimes corroded. A single flat here is small, so if you want to add a sink in the kitchen or a second bathroom we must measure precisely. The existing outlets may be under tile or in a corner, so we sometimes remove part of the foundation or reroute the line. Water comes from the central tank, so pressure is steady and new pipes must withstand it.
Khitan lies in Farwaniya governorate, a relatively older residential area with mid-sized apartment blocks.
Most flats in Khitan connect to a single main drainage line beneath the street, and interior waste outlets are set deep.
In short
The fitting work.
Service
Sanitary fixture installation and connection
The fixtures
Basins, toilets, kitchen sinks, bidet sprays, utility sinks
Included
Fixing, water and waste connection, angle valve, silicone
The old units
Removed and taken out of the way before fitting
Hours
Daily, 6:00 in the morning to 12:00 midnight
How we fit it
From measuringto running it.
The order here saves breaking, which is why we do not rush it.
We measure waste and supply
The height of the waste outlet and the positions of the supply pipes are measured against the new unit's own dimensions, before anything old comes off.
We remove and prepare
The old unit comes off, the old silicone is removed completely and the surface cleaned, because any residue stops new silicone bonding properly.
We fix and level it
The unit is fixed and levelled first, and connected second. Connecting before fixing means any later adjustment pulls on the joints and they start weeping later.
We connect, test and seal
Water and waste are connected, the unit is run, and every joint is checked under pressure. The silicone bead goes on last, once everything is proven dry.
Common questions
Questions about Sanitary fixture installation in Khitan
We can, but the flat needs enough space and the main line must be close by. We inspect the walls first, and if the line is distant we may route to a floor outlet instead of a high outlet.
They can be a problem if the line is partially blocked or pressure is low. We measure the existing pipe diameter and tell you if part or all of it needs replacing. New pipes are wider and give you better flow.
Nearby areas
More areas for Sanitary fixture installation
Same service, in nearby areas.
Other services
Other services in Khitan
Other work we do in the same area.
Back to Sanitary fixture installation