Plumbing and sanitary
Ramadan Drain CleaningSanitary fixture installation in Mubarakiya Camps
Sanitary fixture installation in Mubarakiya Camps means mounting a new WC, basin or shower and connecting water and waste from the local network. Mubarakiya Camps sits near the traditional market in the city centre, with very old buildings and pipes installed by historical methods.
Before you buy
When a swap isnot a swap.
Four things decide whether an installation is simple or needs extra work.
01
The waste sits at a different height
Every fixture has its waste outlet at a set height. If the new toilet takes a floor outlet and yours is in the wall, or the other way round, the installation means changing the waste and not just connecting it.
02
The unit hangs on the wall
A wall hung toilet or basin is not held by tiling. Each needs a steel frame fixed into the wall behind the finish to carry the whole load, and that is decided before the tiling, not after it.
03
The new unit is a different size
A new basin may cover the old fixing holes or fall short of them, and a new toilet may be longer and stand away from the wall. Checking the dimensions before buying saves a trip back to the shop.
04
There is no valve for it
A fixture installed with no angle valve of its own means any later repair stops water to the house. A proper installation includes a valve on each supply arriving at it.
This area
What setsthis area apart
Mubarakiya Camps has old worker camps and tightly packed apartment blocks built in the 1970s or 1980s. Installing fixtures here means working with corroded iron or oxidised brass pipes, and waste lines running deep and often unreachable except with difficulty. Bathrooms are cramped with low ceilings, so we fit compact fixtures. Replacing an old pipe with a new one may require opening the wall, and these buildings have load-bearing walls that cannot be cut.
Mubarakiya Camps sits in Kuwait governorate near the traditional Mubarakiya market in central Kuwait City.
Pipes in Mubarakiya Camps are rusty or oxidised, and water may carry colour or sediment before we install a new fixture.
In short
The fitting work.
Service
Sanitary fixture installation and connection
The fixtures
Basins, toilets, kitchen sinks, bidet sprays, utility sinks
Included
Fixing, water and waste connection, angle valve, silicone
The old units
Removed and taken out of the way before fitting
Hours
Daily, 6:00 in the morning to 12:00 midnight
How we fit it
From measuringto running it.
The order here saves breaking, which is why we do not rush it.
We measure waste and supply
The height of the waste outlet and the positions of the supply pipes are measured against the new unit's own dimensions, before anything old comes off.
We remove and prepare
The old unit comes off, the old silicone is removed completely and the surface cleaned, because any residue stops new silicone bonding properly.
We fix and level it
The unit is fixed and levelled first, and connected second. Connecting before fixing means any later adjustment pulls on the joints and they start weeping later.
We connect, test and seal
Water and waste are connected, the unit is run, and every joint is checked under pressure. The silicone bead goes on last, once everything is proven dry.
Common questions
Questions about Sanitary fixture installation in Mubarakiya Camps
Old pipes are corroded and leak within a year or two. A new copper or plastic line is stronger and safer, though it may require opening a small section of wall. We recommend full replacement if the house is very old.
We fit a compact basin or suggest a wall-hung model instead of one with legs. The new pipe runs behind or inside the wall, taking no floor space.
Other services
Other services in Mubarakiya Camps
Other work we do in the same area.
Back to Sanitary fixture installation