Plumbing and sanitary
Ramadan Drain CleaningSanitary fixture installation in Fintas
Sanitary fixture installation in Fintas means fitting a toilet, sink, or shower in a flat or villa and connecting the water supply and waste outlet correctly. Fintas is a coastal residential area in Ahmadi with a mix of older villas and newer apartment blocks near the co-op and beach.
Before you buy
When a swap isnot a swap.
Four things decide whether an installation is simple or needs extra work.
01
The waste sits at a different height
Every fixture has its waste outlet at a set height. If the new toilet takes a floor outlet and yours is in the wall, or the other way round, the installation means changing the waste and not just connecting it.
02
The unit hangs on the wall
A wall hung toilet or basin is not held by tiling. Each needs a steel frame fixed into the wall behind the finish to carry the whole load, and that is decided before the tiling, not after it.
03
The new unit is a different size
A new basin may cover the old fixing holes or fall short of them, and a new toilet may be longer and stand away from the wall. Checking the dimensions before buying saves a trip back to the shop.
04
There is no valve for it
A fixture installed with no angle valve of its own means any later repair stops water to the house. A proper installation includes a valve on each supply arriving at it.
This area
What setsthis area apart
Fintas has villas from the 1950s and 60s sitting next to modern apartment blocks with different foundations. Old villas sit on high concrete slabs relative to street level, and modern flats have waste stacks rising through the walls. When fitting a toilet or basin in a villa, you protect against ground moisture with a floor seal. Flats have lower floors and known waste runs along the wall or floor, so the outlet height for drainage differs from a villa.
Fintas sits in Ahmadi governorate, a coastal area mixing older villas with modern residential blocks near the co-op.
Most old villas in Fintas lack a separate maid's bathroom, so extra fixtures must connect to the main waste line from the kitchen.
In short
The fitting work.
Service
Sanitary fixture installation and connection
The fixtures
Basins, toilets, kitchen sinks, bidet sprays, utility sinks
Included
Fixing, water and waste connection, angle valve, silicone
The old units
Removed and taken out of the way before fitting
Hours
Daily, 6:00 in the morning to 12:00 midnight
How we fit it
From measuringto running it.
The order here saves breaking, which is why we do not rush it.
We measure waste and supply
The height of the waste outlet and the positions of the supply pipes are measured against the new unit's own dimensions, before anything old comes off.
We remove and prepare
The old unit comes off, the old silicone is removed completely and the surface cleaned, because any residue stops new silicone bonding properly.
We fix and level it
The unit is fixed and levelled first, and connected second. Connecting before fixing means any later adjustment pulls on the joints and they start weeping later.
We connect, test and seal
Water and waste are connected, the unit is run, and every joint is checked under pressure. The silicone bead goes on last, once everything is proven dry.
Common questions
Questions about Sanitary fixture installation in Fintas
Yes, but we need to check the existing line under the floor first. If the concrete slab is thick, we cut carefully at base level and apply a moisture barrier before fitting. Water and waste must run from known points without breaking up the rest of the floor.
A villa is raised above street level so the waste run is longer, and a flat has a stack close to the wall so the pipe is short. If the villa is old, waste does not come from the wall but from the floor, and that changes the fitting method.
Nearby areas
More areas for Sanitary fixture installation
Same service, in nearby areas.
Other services
Other services in Fintas
Other work we do in the same area.
Back to Sanitary fixture installation