Commercial contracts
Ramadan Drain CleaningBuilding and complex maintenance in Abdullah Mubarak
Full network maintenance in Abdullah Mubarak handles residential buildings and flats on a single unified riser feeding a main line. Abdullah Mubarak has mid-rise and relatively older housing on flat ground, and its network sometimes drains slowly because the horizontal lines under the street have a gentle fall.
Signs across a block
Where a block showsits faults.
A block does not complain from one place. These are the spots that show it first.
01
One flat complains and the rest are fine
When one flat has water coming back and the rest drain normally, the fault sits in its own branch or where that branch joins the shared run, not in the shared run itself.
02
Water standing in the car park
A car park gully sits below street level, so any narrowing shows at once as a pool on the concrete. The cause we see most is grit and dust carried down by car washing and settled in the pot.
03
The tank water changes in summer
A roof tank sitting in the sun heats up, the water standing in it changes in taste and smell, and sediment can settle at the bottom. Residents complain about the water rather than the drains, and the cause is above them.
This area
What setsthis area apart
The suburb has 4 to 5-storey apartment buildings built in the eighties and nineties, mostly on flat land with no elevation. The underground network needs care because falls are gentle and sediment collects faster at low points. The ground-level car park needs all drain points checked, and the roofs have older tanks and distribution pipes that may be corroded. We focus on the main riser and the point where all buildings converge because any blockage there affects the whole suburb.
Abdullah Mubarak sits in Farwaniya governorate, a residential suburb on flat ground with mid-rise apartment buildings.
Horizontal lines under the suburb's streets are relatively deep and have gentle falls, so they need regular checks for sediment and mineral deposits.
The work in short
What we cover ina block.
Service
Water and drainage network upkeep for a whole building
Where it applies
Residential blocks, complexes and buildings with several entrances
The points
Inspection chambers, manholes, car park gullies, roof tanks and pumps
Method
Chambers opened in order, drain rods, and a tanker when suction is needed
Coverage
All six governorates and the areas inside them
The round
From the roofto the car park.
We start at the top and work down, because what happens above shows up below.
We start at the tank and pump
We open the tank, look at the water and any sediment in the base, and watch the pump while it runs, because weak supply in the flats usually starts here and not at the tap.
We move to the vertical stacks
The stack collecting the bathrooms of the flats above one another reads from the access points and the landing gullies. We listen for water falling at its normal pace, or hesitating before it goes.
We open the yard chambers in order
We open from the chamber nearest the building and move towards the outlet, reading the level in each channel. A full chamber followed by an empty one puts the stoppage exactly between the two.
We finish at the car park
We lift the car park gully grating, clear what has settled in the pot, and check the outlet still sits above the standing water line, because that seal is what keeps odour out of the car park.
Common questions
Questions about Building and complex maintenance in Abdullah Mubarak
We check the riser and horizontal lines first. If they have sediment or sags, we treat it. If the pipes themselves are cracked, we tell you that you need replacement.
Yes, regular cleaning stops sediment and salt buildup. Every three or four months, we inspect and clean the roofs, car park, and riser.
Nearby areas
More areas for Building and complex maintenance
Same service, in nearby areas.
Other services
Other services in Abdullah Mubarak
Other work we do in the same area.
Back to Building and complex maintenance